New Equipment Is Here
The blade chassis arrived on a palette today (and boy, was that an awesome time getting it upstairs), so that means all the new server equipment is here (except for additional RAM).
We got 1 blade chassis, 10 loaded blades (except for RAM right now), 2 load balancers (1 is a hot spare) and a managed 48-port gigabit switch (along with redundant power supply).
Now I need to go to Home Depot and get an extension cord and plug adapter so I can plug the chassis into a 220V outlet.
Until the equipment is ready to be installed in the data center, we have Yashi (and his camera shy brother, Wiggly) standing guard over it all.