Went up to the site yesterday, and there’s lots of digging going on now. 3 tractors up there (a normal backhoe, a little one for doing foundation footings and then a bit excavator one for digging the basement). It’s hard to tell how much dirt was pulled out, but check out the picture of the excavator (the cab where the dude sits is enclosed on the left side of it). I figure the basement and pool will probably generate ~650 cubic yards of dirt that will need to be hauled away.